| Atlac Groth & Stringth |
ATLAS PLANT Ltd. First established in 2007 at the Industrial Zone (1) of Sulaimaniya City, and following the strategy of meeting clients demand with high efficiency based on a sound business plan the second Plant was opened in 2010 at Kirgha district.
At the beginning the Plant was of 60m3/hour capacity with seven truck mixers, one shovel, one tanker built on a plot of 8000m2. This established Plant was undergoing continuous growth to reach in 2011 to 20 Truck Mixers, 3 shovels, 2 Tankers and changing the Plant capacity to 180m3/hour by importing a German Plant, supported by 3 Pumps of 28m, 42m and 47m respectively, plus 3 pick ups.
The growth of ATLAS ended up in 2010 to open the second Plant which is dry type plant with a capacity of 90m3/hour.
The following are the key Personnel (Work Force):
• 2 Mangers • 1 Mechanical Engineer • 3 Concrete Technicians • 1 Accounting Manger • 2 Accountants • 3 Plant Operators • 4 Operation Assistants • 4 Pump Operators • 22 Truck Mixer Drivers • 3 Shovel Drivers • 3 Pick up Drivers • 10 Support Staff, labourers, guards, etc.
|
|
| Clients |

|
|